After a landslide failure along Salmon Creek that constricted creek flows, AKS was contracted to design a temporary stream diversion for the rebuilding of the slope and stabilization of the creek bank. The developed Temporary Stream Diversion Plan ensured the successful implementation of a bypass pipe through construction.