Evergreen Drive Improvements

AKS contracted with the City of North Bonneville to analyze the condition of City streets and scope a project that would rejuvenate ailing infrastructure and bolster economic growth for the City’s 980 residents. Part of our scope included providing the City complete TIB Small City Arterial and Small City Preservation Project grant applications. Ultimately, AKS designed and oversaw construction of 2,150 linear feet of pavement improvements on Evergreen Drive and 100 linear feet of water main improvements.

2017 ACEC Engineering Excellence Honor Award

Read More »